New contracts for The Renewable Design Company

March has proved to be a good month for new contracts at The Renewable Design Company.

Latest projects include an open loop system on a river bank, providing heat and hot water to a 150kW system at a private residence.

Also the owner of a new build house in the Wye Valley has asked the company to install a 16kW heat pump system using bore holes, they have also decided to include a solar thermal system and a 4kW solar PV installation. The combination of technologies allows the owner to generate their own electricity to reduce the demand of the heat pump, and make the hot water production more efficient with a 3 panel solar thermal installation.

The team have also picked up the contract to design and install the full heating and hot water system of a new build Care Home using air source heat pumps.